3mm round Yellow LED Diode with Long Leads Diffused LED for Light Application 5V Max. Reverse Voltage through Hole Case
Click to enlarge

3mm round Yellow LED Diode with Long Leads Diffused LED for Light Application 5V Max. Reverse Voltage through Hole Case

Shenzhen Highlight Electronics Co., Ltd.

$0.01 - $0.02

MOQ10000 Minimum

Lead Time
Quantity旺季淡季
1 - 100003 days3 days
10001 - 1000008 days8 days
100001 - 100000015 days15 days
> 1000000To be negotiatedTo be negotiated

Product profile

Certification
ISO9001:2015, REACH, ROHS
Operating Temperature(℃)
25 - 80
Product Weight(kg)
1
Color Temperature(CCT)
3500K (Warm White)
Place of Origin
Guangdong, China
Color Rendering Index(Ra)
80
Support Dimmer
Yes
Luminous Intensity
8
Wavelength
585-595NM
Storage Temperature(℃)
25 - 80
Size
3*5.3mm
Product name
3MM Round Yellow Diffused Long Leads LED Diode
Lighting solutions service
Auto Cad Layout, Onsite Metering, Project Installation
Description
3MM Round Yellow Diffused Long Leads LED Diode
Brand Name
hlx
Single package size
35X25X15 cm
Viewing Angle(°)
30
Shape
Round Top
Emitting Color
Red, Cool White, Natural White, Neuter, Warm White, Orange, Yellow
Color Temperature
3500
Optical Attenuation(%)
1
Lifespan (Hours)
3000
Package
through hole
Chip Material
Ingan
Input Voltage(V)
5-8V
Power
0.06W
Warranty(Year)
3-Year
Power Dissipation
1
Luminous Efficacy(lm/w)
1
Single gross weight
3.500 kg
Luminous Flux(lm)
8-9
Selling Units
Single item
lens type
Yellow Diffused
Operating Temperature
-40----+85
Type
Lamp Led

Company profile

Shenzhen Highlight Electronics Co., Ltd.

深圳市海隆兴光电子有限公司
Floor 6, Building E, Huachuangda Science And Technology Park, Gushu Ind. Zone, Hangcheng Road, Baoan Dist. Shenzhen Guangdong China
  • CertifiedVerified Supplier
  • CertifiedTrade Assurance
  • Business Type: Manufacturer, Trading Company
  • Established: 2006
  • Plant Area: 2381㎡
  • Annual Export Value: Confidential
  • Avg. Response Time: ≤ 4h
  • Certification: ISO 9001,(EU) 2015/863,REACH,SVHC

Main Products

  • DIP LED
  • SMD LED
  • COB LED

Main Markets

Mid East(45%), Eastern Europe(21%), Western Europe(15%)