Jack up Platform with Modular Combined Build for Multifunctional Working Task
Click to enlarge

Jack up Platform with Modular Combined Build for Multifunctional Working Task

China ShandongShandong Haiding Shipbuilding Co., Ltd.

$150000.00 - $620000.00

MOQ1 ship

Product profile

Material
Steel
Length
11.80m
Width
11.80m
Mold Depth
1.5m
Free Deck Area
80m2
Max Load
30t
Deck Strength
3t/M2
Spud Leg Height
35.0m Extendable
Spud Leg Diameter
0.48m
Top-Mounted
Hydraulic & Mechanical Locking
Jacking Speed
22m/H
Jacking Stroke
1.20m
Lifting Capacity
40t Per Spud Leg
Operating Wave Height
1.0m
Operating Wind Speed
25km/H

Company profile

Shandong Haiding Shipbuilding Co., Ltd.

山东海鼎船舶制造有限公司
China ShandongQingzhou, Weifang, Shandong, China
  • CertifiedVerified Supplier
  • CertifiedTrade Assurance
  • Business Type: Combined
  • Established: 2021
  • Employees: 33
  • Plant Area: 12233.0m²
  • Avg. Response Time: ≤ 4.27h
  • Certification: ISO9001:2015 certificate,ISO14001,ISO45001:2018 certificate,ISO50001
  • System Certification: ISO9001:2015 certificate,ISO14001:2015 certificate

Main Products

  • N/a

Main Markets

Domestic