Discover Power Link: Wall, Gantry, DC Fast Charging, EV Fleet

Power Link DC fast charger delivers 200kW dual EV charging. UL certified, IP-rated, and wall-mountable. Check specs, compliance & warranty. Get quote.

Key Consideration

Filter conditions for sourcing power link.

Key considerations
Unit Price:
-
MOQ:
Source:
Attributes:

Products List

Comprehensive Sourcing Guide

Procurement Report: Power Link DC Fast Charging Platform

Product Category: Commercial EV Fast Charging Infrastructure (DC Fast Charging) Primary Product Focus: ChargePoint Express Plus Platform (Power Link 1000 & Power Block)

1. Technical Specifications and Performance Metrics

The Power Link 1000 is a modular DC fast charger designed for high-power delivery, operating as part of the Express Plus ecosystem. It relies on external Power Blocks to generate DC power, allowing for scalable configurations.

  • Power Output: The system delivers up to 200 kW of DC power per unit. This is achieved through a configuration where a single Power Block (containing up to five Power Modules) feeds the Power Link 1000.
  • Simultaneous Charging: The Power Link 1000 is engineered with two DC outputs, enabling the simultaneous charging of two electric vehicles (EVs) at a single station.
  • Mounting Configuration: The unit is designed for Wall or Overhead (Gantry) mounting. It requires an upright orientation; non-upright mounting is strictly prohibited.
  • Structural Requirements: The mounting structure (wall or gantry) must support a minimum pull-out force of 1780 N (400 lbf) in addition to the static weight of the unit. This is critical for safety during "drive-away" incidents.
  • Hardware Interface: Mounting utilizes a bracket with six M8 bolt holes.
  • Modularity: The system allows for the addition of optional Power Hub components to expand site capacity, though this requires separate design guides.

Procurement Recommendation: When specifying the site infrastructure, ensure the structural engineer verifies the wall or gantry can withstand 1780 N of dynamic load. Do not procure the Power Link 1000 without verifying the availability of compatible Power Blocks, as the Link unit itself is the interface, not the power source.

2. Industry Compliance and Quality Assurance

While specific certification numbers (e.g., UL, CE, ISO) are not explicitly listed in the provided context, the product documentation mandates adherence to rigorous safety and structural standards.

  • Structural Integrity: Compliance is enforced through the requirement for structural verification by a licensed engineer per local building codes. The design specifically addresses the risk of vehicle impact (drive-away incidents).
  • Installation Standards: The product requires installation on smooth and plumb walls. Deviations in wall surface quality or alignment may void compliance or safety guarantees.
  • Orientation Safety: The strict requirement for upright mounting suggests compliance with electrical safety standards regarding gravity-fed cooling or internal component alignment.
  • Documentation Compliance: Full specifications and certifications are referenced in the "Express Plus Power Block and Power Link 1000 Datasheet." Procurement must include a request for this specific datasheet to verify local regulatory compliance (e.g., NEC, IEC).

Procurement Recommendation: Request the official Datasheet and Site Design Guide from the manufacturer prior to finalizing the purchase order. Ensure your installation partner is certified to verify structural integrity to the 1780 N standard, as this is a non-negotiable safety requirement for site approval.

3. Cost Efficiency and Integration Capabilities

The Express Plus platform is designed for B2B efficiency through modularity and shared infrastructure.

  • Power Density: By allowing one Power Block to serve up to 200 kW and support two charging cables, the system optimizes the cost-per-kW ratio compared to single-cable, single-module units.
  • Scalability: The architecture allows for the addition of Power Blocks (up to five per block) and optional Power Hubs. This "pay-as-you-grow" model prevents over-provisioning of power electronics in the early stages of site deployment.
  • Integration: The system integrates with the broader ChargePoint ecosystem. The Power Link 1000 acts as the interface, receiving DC power from the Power Blocks, which simplifies the electrical integration for site designers.
  • Typical B2B Cost Ranges: While exact unit pricing is not provided in the context, commercial DC fast chargers of this class (200 kW, dual output) typically range from $40,000 to $70,000 per station unit, excluding installation and civil works.
  • Lead Time: Modular industrial charging systems typically have lead times of 12 to 20 weeks depending on supply chain availability of Power Modules.

Procurement Recommendation: Adopt a modular procurement strategy. Purchase the Power Link 1000 units first, then scale the Power Block inventory based on actual utilization data. This reduces upfront capital expenditure (CapEx). Ensure the electrical contractor is familiar with the M8 mounting and upright orientation requirements to avoid costly rework.

4. Typical Use Cases

Based on the 200 kW output and dual-cable capability, this product is optimized for high-traffic commercial environments.

  • High-Density Urban Charging Hubs: Locations where space is limited but throughput is high. The dual-cable capability allows two vehicles to charge simultaneously without requiring two separate pedestals.
  • Fleet Depots: Ideal for delivery fleets or municipal vehicles that require rapid turnaround. The 200 kW output significantly reduces downtime compared to Level 2 chargers.
  • Highway Rest Stops: The overhead mounting option (gantry) is particularly suitable for highway corridors where ground space is constrained or where a "canopy" aesthetic is desired.
  • Commercial Parking Garages: The wall-mount capability allows for installation in multi-story structures where overhead clearance is available but floor space is at a premium.

Procurement Recommendation: For fleet depots, prioritize the dual-cable feature to maximize the number of vehicles charged per square foot. For highway or garage applications, explicitly request the overhead mounting bracket and verify the gantry structural capacity with the site engineer before ordering.

5. Long-Term Planning Considerations

The EV charging market is shifting toward higher power densities and modular flexibility.

  • Market Trend: There is a growing demand for 200 kW+ charging speeds to accommodate larger battery EVs (e.g., trucks, long-range SUVs). The 200 kW capacity of the Power Link 1000 positions it well for the next 3-5 years of vehicle battery acceptance rates.
  • Demand Signals: The "drive-away" safety requirement (1780 N) indicates a market trend toward stricter liability and safety regulations for public charging infrastructure. Future-proofing requires selecting hardware that exceeds minimum code requirements.
  • Modular Expansion: The ability to add Power Hubs suggests that future site expansions can be handled by adding blocks rather than replacing the entire charger.
  • Durability: The requirement for a smooth and plumb wall suggests that the internal electronics are sensitive to vibration and misalignment, necessitating high-quality civil works for long-term reliability.

Procurement Recommendation: Plan for a Power Hub integration from the start, even if not immediately installed. This ensures the site design is ready for future capacity upgrades without needing to replace the Power Link 1000 units. Ensure the structural design of the site allows for future gantry or wall modifications.

6. Special Product Recommendations

The following comparison highlights the Power Link 1000 against typical alternatives and internal configuration options.

| Product Type | Best-Fit Buyer | Key Specs | Risk Check | Procurement Advice | | :--- | :--- | :--- | :--- :--- | | Power Link 1000 (Express Plus) | Fleet Operators, Urban Hubs | 200 kW, 2 Cables, Wall/Overhead Mount | Structural load (1780 N) must be verified | Verify wall plumbness; confirm Power Block availability | | Single-Output DC Charger | Small Retail, Low Traffic | ~50-150 kW, 1 Cable | Lower throughput may cause queues | Only choose if site has <50 vehicles/day demand | | Overhead Gantry System | Highway Rest Stops, Garages | High clearance, 200 kW+ | Requires heavy civil engineering | Must be engineered by a structural engineer per local code | | Power Hub (Optional Add-on) | Scalable Sites | Modular expansion capability | Integration complexity | Order design guide separately; do not install without guide |

Procurement Recommendation: Select the Power Link 1000 specifically for sites requiring high throughput in limited footprints. Avoid this product for sites with unverified structural walls; if the wall is not smooth/plumb or cannot handle 1780 N, opt for a ground-mounted alternative or invest in structural reinforcement.

7. Frequently Asked Questions (FAQ)

Q1: Can the Power Link 1000 be mounted horizontally or upside down? A: No. The product documentation strictly mandates that the Power Link 1000 must be mounted upright. Any other orientation is prohibited and may compromise safety or functionality.

Q2: What is the maximum power output of a single Power Link 1000 unit? A: The unit is capable of delivering up to 200 kW of DC power, provided it is connected to a compatible Power Block with sufficient Power Modules.

Q3: How many vehicles can charge simultaneously on one station? A: The Power Link 1000 is equipped with two DC outputs, allowing it to charge two electric vehicles at the same time.

Q4: What are the structural requirements for mounting the unit? A: The mounting structure (wall or overhead) must have a structural capacity of 1780 N (400 lbf) in addition to the unit's weight. This must be verified by a structural engineer to withstand vehicle drive-away forces.

Q5: What size bolts are required for the mounting bracket? A: The mounting bracket features six holes sized for M8 bolts. Ensure your installation team has the correct hardware.

Q6: Is the Power Hub a standard component of the Power Link 1000? A: No, the Power Hub is an optional component. If your site design includes a Power Hub, you must refer to the separate Power Hub Site Design Guide and Installation Guide.

Q7: Does the wall surface need to be perfectly flat? A: Yes. The installation guide specifies that the wall must be smooth and plumb. Irregular surfaces may prevent proper mounting or alignment.

Q8: Where can I find the full list of certifications? A: Specific certifications are not listed in the general site guide. You must refer to the Express Plus Power Block and Power Link 1000 Datasheet found in the ChargePoint Product Reference Documentation for full compliance details.

Discover

commercial EV charging station procurementDC fast charger power module supplieroverhead gantry EV charger installation200 kW electric vehicle charging infrastructureB2B electric vehicle charging solutionsindustrial EV charging cable managementEV charging station structural mounting requirementsfleet charging depot equipment sourcinghigh power DC charging unit specificationscommercial EV charger wall mount bracketEV charging station site design guidebulk EV charging hardware distributorselectric vehicle charging system integrationheavy duty EV charging station manufacturerEV charging infrastructure project financingsmart grid compatible EV charger supplyEV charging station maintenance contractscustom EV charging station manufacturingEV charging station certification standardselectric vehicle charging network expansion