hotel accommodation Sourcing Overview

Product Type:
ApartmentHotel FurnitureSteel HotelSteel Structure HotelHotel BuildingPrefabricated BuildingModular BuildingPrefab HouseCapsule HotelContainer House
Material:
Steel StructureEPSCementSandwich PanelContainer
Certification:
CEISO 9001SGSULSAANATAGBASTMDINJIS
Building Area:
10-19 Square Meters28.8 Square Meters30.0 Square Meters31.0 Square Meters
Installation Time:
4 Hours1 Day (Preassembled Module)1-2 Days (Preassembled Module)
  • Material and Construction Type Selection Overlooking the compatibility between material and hotel type often leads to structural inefficiencies; for instance, choosing steel structure with sandwich panels suits modular or prefab buildings but may not be ideal for capsule hotels or container houses.

  • Certifications Verification Insist on suppliers providing relevant certifications such as CE, ISO 9001, and ASTM to ensure compliance with international standards and quality assurance, which is critical for safety and regulatory approval.

  • Building Area Optimization Experienced buyers typically evaluate the trade-off between space and cost by considering building areas like 28.8 to 31.0 square meters for guest comfort, balancing room size against the number of units deployable within budget constraints.

  • Installation Time Impact on Project Scheduling Installation time can account for up to several days per unit, especially with preassembled modules requiring 1-2 days; understanding this helps align procurement timelines with construction schedules to avoid costly delays.

No results

No suppliers match the current filters

Frequently Asked Questions