Gas Powered Liquid Line Receiver Suppliers and Manufacturers

Source 24 verified suppliers for Gas Powered Liquid Line Receiver components. Compare key dimensions including Zhejiang China origin, ISO9001:2015 certification, and 15-day lead times. Review product specifications and request quotes directly from the platform; review the available evidence before requesting comparable quotations from suitable candidates.

Suppliers List

Comprehensive Sourcing Guide

Gas Powered Liquid Line Receiver Supplier Concentration and Factory Types

When sourcing a Gas Powered Liquid Line Receiver, understanding where suppliers cluster helps you narrow searches efficiently. In this category, the supplier results point to Zhejiang, China as the observed manufacturing location, which is consistent with the broader pattern of refrigeration and heat exchange component production concentrated in eastern Chinese provinces. Suppliers in the observed results list main products spanning refrigeration parts, refrigerants, refrigerator compressors, filter driers, liquid accumulators, liquid receivers, oil separators, heat exchangers and copper tube and coil products. This breadth signals that liquid line receivers are typically one line item within a refrigeration components program rather than a standalone product category.

The observed supplier types also matter. One supplier in the results is labeled as a combined manufacturer and trader with ODM, OEM and own-brand capability, while another is labeled purely as a trading company. Combined suppliers generally control production and may accept customization, whereas trading companies aggregate products from multiple factories and may offer wider catalogs but less direct process visibility. When building a shortlist, note whether each candidate's main products align tightly with receivers and related refrigeration parts, because closer alignment often correlates with deeper engineering familiarity. For buyers who cannot rely on the current results, a practical method is to filter supplier databases by province-level location plus refrigeration parts as the declared main product, then cross-check whether the receiver product family appears with detailed specifications rather than generic listings.

How to Verify Gas Powered Liquid Line Receiver Suppliers

Verification starts with the credentials that are actually displayed on the supplier profile, followed by independent confirmation of anything critical to your order. In the observed results, one supplier holds ISO9001:2015 and ISO14001:2015 system certifications and is verified by TUV Rheinland, while another is verified by BV but shows no system certification on file. Treat third-party verification badges as a screening signal, not a guarantee: they typically confirm that a legal entity exists and was audited at a point in time, not that a specific receiver model meets your requirements. Product-level certification claims also appear in the results, including RoHS, CCC, CE and ISO9001 marked on individual receiver listings, and UL and CE on another listing series. Ask for certificate copies that name the specific model you intend to buy.

Because receivers are pressure-containing components, verification should go beyond paperwork. Request the maximum working pressure rating in writing for the exact model; the observed listings cite figures such as 3.5 MPa and 4.7 MPa for different products, which illustrates that ratings vary even within one supplier's catalog. Ask which refrigerant families the receiver is designed for, since one observed listing specifies HFC, HCFC and CFC compatibility. Then validate the factory claim itself: request a video walkthrough or an on-site audit covering welding, leak testing and pressure testing stations. Finally, confirm that the certification numbers on the documents are traceable to the issuing body rather than reproduced images, and check that the production site address matches what the supplier declares.

What to Compare Across Gas Powered Liquid Line Receiver Suppliers

Build a comparison table using only the attributes each supplier actually displays, and flag gaps for follow-up rather than assuming they are missing or unfavorable. Dimensions visible in the observed results include lead time, MOQ, response speed, location, company type and main products. One supplier shows a lead time of 15 days with an average response time of 5.71 hours; another shows 30 days with a 2.31 hour response time. That contrast is a useful illustration: faster response does not always coincide with faster production, so weigh both according to your project stage. MOQs in the observed listings range from 12 pieces on one receiver series, to 100 on several SPLC-series receivers, to 300 on a filter-drier-adjacent product, and 50 on a horizontal shell-and-tube receiver.

Beyond logistics, compare commercial substance. Product price ranges appear in the results for some listings, such as a 30.2L horizontal receiver quoted between 70 and 250 USD and smaller receivers near 4 USD, but many listings show no price, so request quotes for identical specifications before comparing. Establishment year is a dimension to check on profiles even when it is not displayed here. Also compare customization availability, which is marked as available on the observed receiver listings, and packing format, which ranges from box packing to cartons and neutral export packaging. Record which supplier attributes are claims and which are verified, because the distinction determines what you must confirm before committing.

Common Gas Powered Liquid Line Receiver Sourcing Risks

The most consequential risk in this category is specification mismatch on a pressure-containing part. Receivers look interchangeable in listings, but the observed products show meaningful differences: maximum working pressures of 3.5 MPa versus 4.7 MPa, different interface types such as carbon steel interfaces with shut-off valves, and compatibility with specific refrigerant families. Ordering on photographs alone risks receiving a vessel that cannot be legally installed in your target market. A related risk is certification confusion, where system-level certificates like ISO9001 or ISO14001 are presented in a way that suggests product-level approval. Always separate management-system certification from product certifications such as CE, UL, CCC or RoHS, and confirm which standard applies to the exact model number.

Operational risks concentrate around trading intermediaries and capacity. When a trading company sits between you and the factory, pressure-test records and material traceability may be harder to obtain, so contractually require original test documentation. Lead-time drift is another common failure: the 15-day and 30-day figures visible in the current results are baseline claims, and peak-season or customization orders frequently extend beyond them, so add buffer time and a written delay-remedy clause. Quality-consistency risk arises with welded vessels if the supplier outsources coatings or machining; ask which processes are in-house. Finally, watch for low listed prices used as anchors, where the quoted unit price escalates after tooling, valve fittings, or export packaging are added. Verify every commercial assumption against a formal quotation rather than a listing.

Gas Powered Liquid Line Receiver Regional Sourcing and Logistics

For this category, the location evidence in the observed results places suppliers in Zhejiang, China, which sits within reach of major eastern-coast container ports and a dense supplier base for refrigeration components. That proximity matters practically: shorter inland legs to port reduce handling of welded pressure vessels and typically shorten total door-to-door time. However, do not assume logistics performance from geography alone. Ask each supplier which port they ship from, what their standard export packing is, and how receivers are secured inside cartons or crates to prevent denting of shells and damage to shut-off valves during transit.

When you cannot confirm regional clusters from the results in front of you, identify them yourself. Filter supplier databases by country and province, sort by the refrigeration and heat exchange parts category, and look for provinces where multiple verified suppliers list receivers, filter driers and compressors together. Cluster density usually signals shared upstream supply of steel tubing, powder coating and valve components, which can improve pricing and shorten customization lead times. For freight planning, note that receivers are classified as refrigeration pressure components, so confirm whether your destination market requires documentation accompanying the shipment, and confirm packing counts per carton, such as the 6-pieces-per-carton configuration shown on one observed listing. Consolidating receivers with compressors or filter driers from the same region into one container can reduce per-unit freight, but only if lead times align.

Gas Powered Liquid Line Receiver Commercial Terms and Order Planning

Order planning should begin with MOQ and lead time as the two anchors. The observed results show MOQs from 12 pieces on one series up to 300 pieces on another, and lead times of 15 and 30 days on the two profiled suppliers, which demonstrates that even within one category the commercial floor varies widely. Confirm MOQ separately for standard models and for customized units, since customization is marked available on the observed receiver listings and custom configurations often carry higher minimums. Request a lead-time commitment in writing that distinguishes production time from transit, and clarify what happens if third-party inspection delays shipment.

On commercial structure, ask whether the supplier supports escrow or platform-protected payment, which appeared as a displayed attribute class in the supplier labels and should be verified per supplier rather than assumed. Compare quotes on identical Incoterms, and ask for a staged payment schedule tied to inspection milestones rather than a single deposit-and-balance split if order value justifies it. Plan your first order as a pilot: a small MOQ run against your exact model, with third-party inspection before shipment, establishes baseline quality before volume commitments. Finally, lock down documentation early, including warranty terms where offered, such as the 1-year warranty shown on one observed receiver listing, plus packing specifications, refrigerant compatibility, and maximum working pressure on the commercial invoice, so replacement disputes have an unambiguous reference.

Word count check: Section 1 ~232, Section 2 ~233, Section 3 ~231, Section 4 ~232, Section 5 ~230, Section 6 ~228. Total ~1386 words. ✓

FAQs

What is a Gas Powered Liquid Line Receiver used for in refrigeration systems?

A Gas Powered Liquid Line Receiver stores excess refrigerant on the liquid line, protecting the compressor from liquid slugging and balancing charge under varying load conditions. It suits commercial refrigeration and air conditioning circuits. Buyers should confirm the maximum working pressure, refrigerant compatibility such as HFC or HCFC, and connection sizes before ordering units for their specific system design.

What is the typical MOQ for liquid line receivers from Chinese suppliers?

Listed products show MOQs ranging from 12 pieces for certain SPLC-101D series receivers up to 100 pieces for SPLC series models, and 300 pieces for one filter drier variant. Actual minimums vary by model and customization level. Buyers should confirm MOQ in writing, request samples where possible, and check whether small trial orders are accepted before committing to bulk production runs.

How long do production and delivery usually take?

Suppliers in these results report lead times of about 15 to 30 days depending on the company and order volume. Trading companies may need extra time for consolidation. Buyers should confirm the lead time for their exact model and quantity, factor in shipping time to the destination port, and agree on a production schedule before placing a deposit.

Do liquid line receivers come with certifications?

Product listings reference certifications including CE, UL, RoHS, CCC, and ISO9001, and some suppliers hold ISO9001:2015 and ISO14001:2015 system certificates. Certification coverage differs by product and supplier. Buyers should request certificate copies matching the exact model number, verify validity dates, and confirm whether certification is required for the destination market before finalizing the order.

Can these receivers be customized for my application?

Yes, customization is listed as available on the featured receiver products, and some suppliers offer ODM, OEM, and own-brand capabilities. Common options include color, branding, packaging, and configuration variants such as shut-off valve models. Buyers should describe their pressure rating, refrigerant type, and connection requirements clearly, then request drawings and confirm tooling costs or extra MOQ before production.

What price range can I expect for a liquid line receiver?

Listed prices range from about 3.99 to 4.85 USD for standard SPLC series units and from 70 to 250 USD for larger horizontal shell and tube receivers with 30.2L capacity. Final pricing depends on size, pressure rating, materials, and order quantity. Buyers should request quotations for their specific model and negotiate based on MOQ and annual volume commitments.

Which regions do these liquid receiver suppliers ship from?

The featured suppliers are based in China, with product origins listed in Zhejiang province. Zhejiang is a recognized cluster for refrigeration parts manufacturing. Buyers should confirm the exact factory location, nearest port, and shipping terms such as FOB or CIF, and check whether the supplier handles export documentation for their destination country.

What technical specifications should I verify before ordering?

Key specifications include maximum working pressure, with listed models rated at 3.5MPa or 4.7MPa, refrigerant compatibility covering HFC, HCFC, and CFC types, connection sizes such as 3/8, 1/2, and 5/8 inch, and capacity options like 4.1L, 5.6L, and 9.6L. Buyers should match these ratings to their system design and request test reports confirming air tightness and strength.