OEM Standard Excavator Bucket Suppliers and Manufacturers
Find 10 verified suppliers offering oem standard excavator buckets with customizable sizes and certifications like ISO 9001. Compare lead times, response rates, and locations in China to source heavy-duty attachments efficiently. Contact suppliers directly to request quotes; review the available evidence before requesting comparable quotations from suitable candidates.
Suppliers List

Jining Sun Machinery Co., Ltd.
- Verified by CTI
- Trading Company,Manufacturer/Factory
- China Shandong
- Lead time23 days
- Avg. response≤ 4h
Main productsExcavator Bucket, Cutting Edge, Ripper, Log Grapple, Compactor Wheel, Gp Bucket, Rock Bucket, Cleaning Bucket, Skeleton Bucket, Tilt Bucket
Main marketsSouth America,Eastern Europe,Mid East,North America,Southeast Asia,Eastern Asia,Oceania,Western Europe,Africa

Xiamen Gold Forging Industry Co., Ltd.
- Verified by CTI
- Manufacturer/Factory
- China Fujian
- Lead time38 days
- Avg. response≤ 4h
Main productsBucket Teeth, Excavator Bucket, Bucket Adapter, Cutting Edges, Bucket Attachment, Tooth Lock Pin, Bucket Pin, Excavator Parts, Motor Grader Blade, Bolt & Nuts
Main marketsSouth America,Eastern Europe,Mid East,North America,Southeast Asia,Eastern Asia,Western Europe,Africa

Xuzhou Shenfu Construction Machinery and Equipment Co., Ltd.
- Verified by BV
- Combined
- China Jiangsu
- Lead time30 days
- Avg. response≤ 22h
Main productsRipper, Excavator Part, Excavator Bucket
Main marketsSouth America,Africa,Southeast Asia/ Mideast,Domestic,Europe,Australia,North America



MOQ: 1 Pieces

Excavator S Bucket Good Quality
MOQ: 1 Pieces

Yantai Chengtai Construction Machinery Co., Ltd.
- Verified by TUVRHEINLAND
- Trading Company,Manufacturer/Factory
- China Shandong
- Lead time23 days
- Avg. response≤ 6h
Main productsHydraulic Breaker Factory, Hydraulic Rock Breaker Factory, Hydraulic Hammer Factory, Hydraulic Demolition Shears, Excavator Concrete Crusher, Hydraulic Compactor, Hydraulic Breaker Hammer Factory, Earth Auger, China Breaker Hammer Factory, Tilting Quick Hitch
Main marketsSouth America,Eastern Europe,Mid East,North America,Southeast Asia,Eastern Asia,Oceania,Western Europe,Africa

Xuzhou Lanyang Machinery Technology Co., Ltd.
- Trading Company
- China Jiangsu
- Lead time0 days
- Avg. response≤ 1h
Main productsExcavator Bucket

Xuzhou Landmate Machinery Co., Ltd.
- Verified by CTI
- Manufacturer/Factory
- China Jiangsu
- Lead time23 days
- Avg. response≤ 1h
Main productsExcavator Buckets, Rock Buckets, Heavy Duty Buckets, Severe Duty Buckets, Mining Buckets, Digging Buckets, Excavator Attachments, OEM Excavator Buckets, Custom Excavator Buckets, Wheel Loader Buckets
Main marketsSouth America,Eastern Europe,Mid East,North America,Southeast Asia,Eastern Asia,Oceania,Western Europe,Africa

Digging Bucket Standard Excavator Bucket General Purpose Excavator Bucket for Excavator Bucket Parts
$299.00 - $499.00
MOQ: 1 Pieces


Xuzhou Jiufa Construction Machinery Co., Ltd.
- Verified by BV
- Combined
- China Jiangsu
- Lead time60 days
- Avg. response≤ 2h
Main productsMobile Crane, Rough Terrain Crane, Truck Crane, Pipelayer, Structural Parts, Garbage Truck, Self Erecting Tower Crane, Dump Truck, Crawler Crane, Line Machine
Main marketsSouth America,Africa,Southeast Asia/ Mideast,Domestic,Europe,North America

NINGBO YINZHOU GET MACHINERY LTD.
- Verified by CTI
- Trading Company,Manufacturer/Factory
- China Zhejiang
- Lead time15 days
- Avg. response≤ 10h
Main productsHydraulic Breaker Chisel, Hydraulic Breaker, Hydraulic Breaker Spare Parts, Hydraulic Breaker Pistons, Hydraulic Breaker Bushes, Hydraulic Breaker Pins, Hydraulic Breaker Front Heads and Back Heads, Hydraulic Breaker Seal Kits, Hydraulic Breaker Diaphragms, Hydraulic Breaker Bolts
Main marketsSouth America,Eastern Europe,Mid East,North America,Southeast Asia,Eastern Asia,Oceania,Western Europe,Africa

ANHUI YUANPENG INTERNATIONAL TRADE CO., LTD.
- Verified by TUVRHEINLAND
- Trading Company,Manufacturer/Factory
- China Anhui
- Lead time23 days
- Avg. response≤ 7h
Main productsBamboo Trailer Flooring, Mulch Film, Flatbed Flooring, Bamboo Truck Flooring, Agriculture Mulch Film, Eco-Agriculture Film, Biodegradable Mulch Film, Mulch Film Machine, Root Trainer, Nursery Cup
Main marketsSouth America,Eastern Europe,Mid East,North America,Southeast Asia,Eastern Asia,Oceania,Western Europe,Africa

Hunan Hongchang Machinery Co., Ltd
- Verified by CTI
- Combined
- China Hunan
- Lead time120 days
- Avg. response≤ 3h
Main productsBucket, Mechanical Quick Change, Hydraulic Quick Change
Main marketsDomestic
Comprehensive Sourcing Guide
OEM Standard Excavator Bucket Supplier Concentration and Factory Types
The current search results indicate a concentration of suppliers located in China, specifically within the Shandong and Fujian provinces. Shandong-based entities are identified as operating in Jining, while Fujian-based operations are noted in Xiamen. These regions serve as the primary manufacturing clusters for the observed product range, which includes various excavator buckets, cutting edges, and related attachments. The data confirms that suppliers in these locations offer a mix of company types, including both trading companies and manufacturers or factories. This dual structure suggests that buyers may encounter direct production facilities alongside intermediaries that manage logistics and sales for multiple factories.
When evaluating the factory types, it is essential to distinguish between entities that hold their own brands and those that operate strictly as OEM or ODM providers. The available facts show that some suppliers possess their own brands, such as SUNMACH, while others offer services under the TH brand or generic OEM labels. This distinction impacts the supply chain dynamics, as manufacturers with their own brands may have more standardized production lines, whereas trading companies might aggregate products from various sources. Buyers should verify the specific nature of the entity they are engaging with to ensure alignment with their sourcing strategy, whether that involves direct factory interaction or a managed trading relationship.
How to Verify OEM Standard Excavator Bucket Suppliers
Verification of supplier credentials is a critical step when sourcing oem standard excavator buckets, particularly given the mix of trading companies and manufacturers in the results. The data indicates that some suppliers hold ISO 9001 and ISO 14001 certifications, which are standard quality and environmental management systems. Additionally, specific verification marks such as CTI are present in the results, serving as a third-party validation of the supplier's status. Buyers must confirm that these certifications are current and applicable to the specific products being ordered, as the presence of a certificate does not automatically guarantee the quality of every individual unit produced.
Beyond certifications, buyers should assess the response time and verification status of the supplier to gauge their operational reliability. The observed response times in the results range from approximately 3.09 to 3.53, which can serve as a baseline for expected communication speed. However, these figures are averages and may vary based on the specific inquiry or time of day. It is also important to check if the supplier provides test reports, as some product listings mention the availability of such documentation. Buyers should explicitly request these reports and verify the testing standards used to ensure the excavator buckets meet the required mechanical properties and durability expectations for their specific application.
What to Compare Across OEM Standard Excavator Bucket Suppliers
Comparing suppliers requires a detailed analysis of lead times, minimum order quantities, and pricing structures, as these factors vary significantly across the results. Lead times observed in the data range from 23 days to 38 days, indicating that production schedules differ based on the supplier's capacity and current order volume. Minimum order quantities also show a wide disparity, with some listings accepting orders as low as one unit, while others require a minimum of 5000 units. This variation is crucial for buyers to evaluate, as it directly impacts inventory management and cash flow. Buyers must align their order volume with the supplier's MOQ to avoid unnecessary costs or stockouts.
Pricing and customization capabilities are another key area for comparison. The price range for the products spans from 80.00 to 3500.00, reflecting differences in bucket size, material grade, and specific model compatibility. Some suppliers offer customization for size and model, such as Foton Lovol 130 or CAT320, while others provide standard heavy-duty buckets. Buyers should compare the cost per unit against the customization options available, ensuring that the price includes necessary features like pallet packing or specific certifications. Additionally, the availability of OEM and ODM services should be weighed against the buyer's need for branding or specific engineering modifications, as not all suppliers offer the same level of flexibility in these areas.
Common OEM Standard Excavator Bucket Sourcing Risks
One significant risk in sourcing oem standard excavator buckets is the potential mismatch between the claimed product specifications and the actual delivered goods. The product listings mention various models and applications, such as rock buckets for Hitachi or standard buckets for Foton Lovol, but buyers must verify that the physical product matches the intended excavator model. Discrepancies in dimensions, material thickness, or attachment points can lead to operational failures on the job site. Buyers should request detailed technical drawings and physical samples before placing large orders to mitigate the risk of receiving incompatible or substandard equipment.
Another risk involves the variability in lead times and the potential for delays in production or shipping. The observed lead times of 23 to 38 days suggest that production capacity is not uniform across all suppliers. If a buyer places an order with a supplier who is already at capacity, the delivery date may be pushed back significantly. Furthermore, the reliance on third-party logistics or trading companies can introduce additional layers of complexity and potential delays. Buyers should establish clear communication channels and request regular production updates to monitor progress. It is also advisable to include penalty clauses in the contract for late deliveries to protect against schedule disruptions.
OEM Standard Excavator Bucket Regional Sourcing and Logistics
Sourcing from the identified regions of Shandong and Fujian in China offers logistical advantages due to established manufacturing clusters and port access. Suppliers in Jining, Shandong, and Xiamen, Fujian, are positioned near major shipping routes, which can facilitate efficient export logistics. The product origin data confirms these locations, allowing buyers to estimate shipping times and costs more accurately. However, buyers should verify the specific port of loading for each supplier, as this can impact transit times and freight charges. Understanding the regional logistics network helps in planning the supply chain and anticipating potential bottlenecks during peak seasons.
Logistics planning also involves considering the packaging and handling requirements for heavy machinery parts. The product attributes indicate that items are typically packed on pallets or in export packages, which is standard for international shipping. Buyers should confirm the packaging details to ensure that the buckets are protected during transit and that the packaging meets the requirements of the destination country. Additionally, the weight and dimensions of the buckets can affect shipping costs, so buyers should request detailed packing lists and dimensions. Coordinating with freight forwarders who have experience in handling construction machinery attachments can further streamline the logistics process and reduce the risk of damage during transport.
OEM Standard Excavator Bucket Commercial Terms and Order Planning
Commercial terms for oem standard excavator buckets often include specific payment structures and delivery conditions that buyers must carefully review. The data shows a wide range of minimum order quantities, from single units to thousands, which influences the payment terms and pricing tiers. Buyers should negotiate payment schedules that align with their cash flow, such as partial payments upon order confirmation and balance upon shipment. It is also important to clarify the Incoterms, such as FOB or CIF, to determine who is responsible for freight and insurance costs. Clear commercial terms prevent misunderstandings and ensure that both parties have a shared understanding of their obligations.
Order planning requires a strategic approach to manage inventory and production schedules effectively. Given the lead times of 23 to 38 days, buyers should place orders well in advance of their project deadlines to avoid delays. Planning should also account for potential variations in production capacity and the availability of raw materials. Buyers should maintain a buffer stock of critical components, such as bucket teeth and adapters, to ensure continuous operation. Additionally, establishing a long-term relationship with a reliable supplier can provide better access to capacity and more favorable terms. Regular communication and forecasting help in aligning production schedules with market demand, ensuring a steady supply of high-quality excavator buckets.
FAQs
Where are these excavator buckets manufactured?
Most listed excavator buckets originate from Jining in Shandong Province, China. Some suppliers also operate from Xiamen in Fujian Province. Buyers should verify the specific factory location on the product page to confirm shipping routes and origin details before placing orders.
What is the typical lead time for delivery?
Lead times vary significantly between suppliers, ranging from approximately 23 days to 38 days. Some listings indicate a delivery window of 7 to 10 days after contract establishment. Buyers must check the specific lead time listed for each product to plan their project schedules accurately.
Do suppliers offer customization for bucket sizes?
Yes, customization is available for many excavator bucket models listed. Products often allow size adjustments based on specific drawings or requirements. Buyers should confirm the customization options and any associated costs directly with the supplier to ensure the final product meets their exact machinery specifications.
What certifications do these buckets hold?
Many suppliers provide buckets certified under ISO 9001 and ISO 14001 standards. Some products also carry CE certification. Buyers should verify the specific certification documents provided for each item to ensure compliance with their local safety and quality regulations before finalizing any purchase agreement.
What is the minimum order quantity required?
Minimum order quantities differ by supplier and product type. Some listings accept orders as low as one unit, while others require a minimum of 5000 units. Buyers need to review the specific MOQ listed for each product to determine if it fits their procurement volume requirements.
How quickly do suppliers typically respond to inquiries?
Response times for these suppliers generally average around 3 to 4 hours. Specific response metrics show values like 3.09 hours or 3.53 hours. Buyers should expect a relatively quick reply but should still initiate contact early to secure the best availability and pricing for their specific needs.
Are these buckets suitable for heavy-duty applications?
Yes, many listed products are designed as heavy-duty buckets for applications like rock excavation and iron ore handling. They often feature high-strength materials and reinforced structures. Buyers should check the specific product type and working condition details to ensure suitability for their intended heavy-duty tasks.





























