Used Core Motor and PLC Components Suppliers And Manufacturers
Explore 11 verified suppliers offering Used Core Motor and PLC Components with varying lead times, response speeds, and certifications. Buyers can compare locations in China, response times, and product standards before requesting quotes for automation parts; review the available evidence before requesting comparable quotations from suitable candidates.
Suppliers List
Foshan Copartner Technology Co., Ltd
- Verified by BV
- Trading Company
- China Guangdong
- Lead time15 days
- Avg. response≤ 6h
Main productsAutomation PLC Inverter Drive & Servo Motor
Main marketsDomestic

Siemens PLC and Module Replacement Parts - Authentic Components for Maintenance and Repair
$1000.00 - $1100.00
MOQ: 1 Pieces

Genuine Siemens PLC and Siemens Module - Original Components for Reliable Upgrades
$1000.00 - $1100.00
MOQ: 1 Pieces

Siemens PLC CPU Central Processing Unit Compatible with Various HMI Panels
$1000.00 - $1100.00
MOQ: 1 Pieces

Reliable Siemens PLC CPU and HMI Replacement Parts for Maintenance and Upgrade
$1000.00 - $1100.00
MOQ: 1 Pieces
Shenzhen Wonderful Tech Co., Ltd.
- Verified by TUVRHEINLAND
- Trading Company
- China Guangdong
- Lead time15 days
- Avg. response≤ 4h
Main productsPLC
Main marketsSouth America,Africa,Southeast Asia/ Mideast,Europe,North America
Yicun Technology (Dongguan) Co., Ltd
- Verified by TUVRHEINLAND
- Combined
- China Guangdong
- Lead time15 days
- Avg. response≤ 1h
Main productsPrecision Hardware and Equipment Industry, Mold Component, CNC Machining Parts for Camera, OEM Aluminum Custom Milling Turning CNC Machinin, Aluminum Part, Acrylic Sheet Parts, CNC Machining of Metal Parts
Main marketsDomestic


Durable Machinery Component for Heavy-Duty Applications and Machinery
$1.00 - $999999.00
MOQ: 1 Pieces

Fujian Bluesky Pipe Manufacturing Co., Ltd.
- Verified by BV
- Combined
- China Fujian
- Lead time30 days
- Avg. response≤ 1h
Main productsSeamless Steel Pipe/Tube, Carbon Seamless Steel Pipe/Tube, Precision Seamless Steel Pipe/Tube, Seamless Pipe/Tube, Alloy Steel Pipe/Tube
Main marketsDomestic
Lishui Chuangfeng Technology Co., Ltd
- Verified by TUVRHEINLAND
- Combined
- China Zhejiang
- Lead time15 days
- Avg. response≤ 1h
Main productsLinear Module, Ball Screw
Main marketsDomestic

Xiangtan Xemc Motor Sales Corporation Limited
- Manufacturer/Factory
- China Hunan
- Lead time15 days
- Avg. response≤ 10h
Main productsElectric Motor, AC Motor, Asynchronous Motor, DC Motor, High Voltage Motor, Energy Saving Motor, Low Voltage Motor, Squirrel Cage Motor, Slip Ring Motor, Three Phase Electric Motor
Main marketsSouth America,Mid East,Southeast Asia,Eastern Asia,Oceania,Africa




High Quality Electric Motor Accessories
MOQ: 1 Pieces

Shijiazhuang Hanjiu Technology Co., Ltd.
- Trading Company,Manufacturer/Factory
- China Hebei
- Lead time0 days
- Avg. response≤ 12h
Main productsOrbit Hydraulic Motor, Hydraulic Steering Unit, Directional Valve

Wuxi Gelanten Technology Co., Ltd.
- Verified by TUVRHEINLAND
- Manufacturer/Factory
- China Jiangsu
- Lead time23 days
- Avg. response≤ 2h
Main productsCNC Machining Parts, Custom Machining Part, OEM Parts, CNC Machining Service, Custom Machinery Part, Technology Solution Service, High Precision Customized Fixture, High Precision Shaft, Metal Injection Molding Part, Aluminum Casting Mold
Main marketsSouth America,Eastern Europe,Mid East,North America,Southeast Asia,Eastern Asia,Oceania,Western Europe,Africa
Shanghai Borui Hong Industrial Trading Co., Ltd
- Verified by CTI
- Trading Company,Manufacturer/Factory
- China Shanghai
- Lead time15 days
- Avg. response≤ 4h
Main productsThree Phase Transformer, Diesel Generator, Gasoline Generator, Generator Genset, Control Cabinet, Transformer Core, Generator Accessories, Tiller, Marine Engine, Transformer Accessories
Main marketsSouth America,North America,Southeast Asia,Africa

Advanced AC Motor Speed Control Module for Enhanced Operational Efficiency
$50.00 - $59.00
MOQ: 1 Pieces

Ningbo Oushijie Hydraulic Transmission Co., Ltd.
- Verified by SGS
- Combined
- China Zhejiang
- Lead time15 days
- Avg. response≤ 8h
Main productsHydraulic Motor, Hydraulic Spare Parts, Reduction Gear, Drum Cutter
Main marketsDomestic,Europe,North America

Tianjin Omini Technology Co., Ltd.
- Verified by BV
- Trading Company
- China Tianjin
- Lead time15 days
- Avg. response≤ 25h
Main productsInverter / Servo, PLC, Relay, IGBT Module, HMI, VFD, Sensor
Main marketsEurope
Comprehensive Sourcing Guide
Used Core Motor and PLC Components Supplier Concentration and Factory Types
The current supplier landscape for automation components reveals a concentration of trading companies and combined manufacturing entities located primarily in China Guangdong and China Fujian. These regions host suppliers offering automation PLC inverter drives, servo motors, and precision hardware, indicating a strong industrial cluster for electrical equipment and fabrication services. Some suppliers operate as trading companies focusing on Siemens PLC and module replacement parts, while others function as combined entities providing OEM and ODM capabilities for CNC machining and aluminum parts. This mix suggests that buyers may encounter both direct manufacturers of hardware components and intermediaries specializing in authentic replacement parts for maintenance and repair.
When evaluating factory types, it is essential to distinguish between trading companies and those with own-brand or ODM capacities. Evidence shows suppliers with RD capacities ranging from own brands to ODM services, often accompanied by certifications like ISO9001:2015 and ISO14001:2015. Buyers should verify if a supplier's main products align with their specific needs, such as seamless steel pipes, precision CNC machining, or specific PLC modules. The presence of combined company types suggests a broader capability to handle diverse orders, from mass production of hardware tools to batch production of hydraulic components. Understanding these structural differences helps in selecting a partner capable of meeting specific volume and customization requirements without relying on unverified claims about their internal production capabilities.
How to Verify Used Core Motor and PLC Components Suppliers
Verification of supplier credibility relies heavily on third-party audit reports and specific certification badges rather than general reputation. Current data indicates that some suppliers hold BV verification status, while others possess TUVRHEINLAND credentials, providing a baseline for trustworthiness. Additionally, system certifications such as ISO9001:2015 and ISO14001:2015 are explicitly listed for certain manufacturers, serving as concrete evidence of quality management systems. Buyers must confirm these specific badges directly on the supplier profile, as the absence of a BV or TÜV mark does not necessarily imply a lack of quality but requires further due diligence to establish reliability.
Beyond external audits, buyers should scrutinize product attributes and origin details to ensure authenticity. Product evidence lists origins ranging from Germany to China, with specific models like PLC-038 and PLC-007 noted alongside certifications like RoHS, CCC, and ISO: CE. It is critical to verify that the stated origin matches the physical product, especially when sourcing "Genuine" or "Original" components. Buyers should request documentation proving the condition of items, such as "New" status, and confirm that materials like aluminum alloy or steel meet the specified standards. Relying on these explicit data points rather than marketing language ensures that the components received match the technical specifications required for industrial automation and control systems.
What to Compare Across Used Core Motor and PLC Components Suppliers
Comparing suppliers requires a systematic analysis of response times, lead times, and minimum order quantities to determine operational efficiency. Response times in the current dataset vary significantly, with some suppliers responding in under one minute while others take nearly six minutes. Lead times also differ, with specific examples showing 15-day and 30-day windows for delivery. Buyers should prioritize suppliers with faster response times for urgent maintenance needs, while those with longer lead times may be suitable for planned upgrades or bulk orders. Minimum order quantities are equally critical, as some suppliers offer an MOQ of just one unit, whereas others may have higher thresholds for specific custom machining services.
Price ranges and customization options provide another vital dimension for comparison across the supplier base. Product pricing spans from approximately 59 to 1100 units for specific PLC modules, while broader machining services can range from 1 to nearly one million units depending on complexity. Customization availability is explicitly noted for many products, allowing for tailored solutions in signal types, structure, and function. Buyers must evaluate whether the price point aligns with the required certification levels, such as ASME or JIS codes, and the specific application industries like automotive or packaging. By mapping these variables, buyers can identify suppliers that offer the best balance of cost, speed, and flexibility for their specific procurement strategy.
Common Used Core Motor and PLC Components Sourcing Risks
One significant risk involves the discrepancy between product descriptions and actual component origins, particularly when sourcing "Genuine" or "Original" parts. While some product attributes list origins as Germany, others indicate China, creating potential confusion regarding authenticity and warranty coverage. Buyers must verify the specific model numbers and brand affiliations, such as Siemens, to ensure they are receiving the correct components for their systems. The risk of receiving non-compliant or counterfeit parts is heightened if the supplier does not provide clear evidence of their supply chain or if the product condition is not explicitly stated as "New."
Another risk pertains to the variability in quality control standards and inspection protocols across different suppliers. While some suppliers claim 100% inspection and utilize professional QC staff and spectrographs, others may rely on general quality checks. The absence of specific quality control details in a supplier's profile can lead to inconsistent product performance, especially in critical applications like hydraulic components or precision machinery parts. Buyers should demand detailed inspection reports and confirm that the supplier adheres to relevant standards like ASME, TEMA, or GB codes. Failing to verify these quality assurance measures can result in costly downtime and safety hazards in industrial environments.
Used Core Motor and PLC Components Regional Sourcing and Logistics
Regional sourcing strategies should focus on the specific industrial clusters identified in the supplier data, such as Guangdong and Fujian. These regions host a high density of suppliers offering automation drives, servo motors, and precision machining services, making them logical hubs for procurement. Buyers should consider the logistical advantages of sourcing from these areas, including established shipping routes and experienced freight forwarders familiar with industrial equipment. However, the distance between the supplier location and the buyer's facility can impact lead times and shipping costs, necessitating careful planning for international freight.
Logistics planning must also account for the specific shipping terms and payment methods offered by suppliers. Evidence shows terms like EXW, FOB, CFR, CIF, and DDP, alongside payment options such as TT and LC. Buyers need to select the term that best aligns with their risk tolerance and logistical capabilities. For instance, DDP terms simplify the process by including delivery to the buyer's door, while EXW places the burden of transport on the buyer. Understanding these terms is crucial for calculating the total landed cost and ensuring that the supply chain remains resilient against potential disruptions in the logistics network.
Used Core Motor and PLC Components Commercial Terms and Order Planning
Commercial terms and order planning require a detailed review of payment structures and delivery schedules to ensure financial and operational stability. Suppliers may offer various payment methods, including TT and LC, which provide different levels of security for both parties. Buyers should negotiate terms that protect their interests while maintaining a positive relationship with the supplier. Additionally, understanding the production type, whether mass production or batch production, helps in forecasting inventory needs and managing cash flow effectively. This foresight is essential for maintaining a steady supply of critical components without overstocking or facing shortages.
Order planning must also consider the customization capabilities and standardization of the products. While some suppliers offer non-customized items with standard models, others provide extensive customization options for materials, structures, and functions. Buyers should clearly define their requirements early in the process to avoid delays caused by miscommunication or rework. The availability of drawing formats like 2D PDF or 3D IGES/STEP files facilitates precise communication of design specifications. By aligning commercial terms with clear technical requirements, buyers can streamline the procurement process and ensure that the delivered components meet the exact needs of their industrial applications.
FAQs
What is the typical lead time for Siemens PLC components?
The typical lead time for these components is 15 days. Some suppliers offer faster response times around 3 hours. Buyers should verify specific delivery schedules before placing orders to ensure timely project completion.
Are these PLC modules available with a minimum order quantity of one?
Yes, many listings allow a minimum order quantity of one unit. This flexibility supports small-scale maintenance needs. Buyers can purchase single modules without needing to meet bulk purchase thresholds for immediate repairs.
Which certifications do the automation components typically hold?
Common certifications include RoHS, CCC, and ISO CE standards. Some suppliers also hold ISO9001:2015 and ISO14001:2015 certificates. These ensure compliance with safety and environmental regulations for industrial equipment usage.
What is the price range for genuine Siemens PLC parts?
Prices for these parts range from 59 to 1100 units depending on the model. Specific CPU units often fall between 1000 and 1100. Lower cost modules are available for general control applications starting at 59.
Where are the suppliers of these automation components located?
Suppliers are primarily located in Guangdong and Fujian provinces in China. Some components originate from Germany while others are manufactured locally. Buyers should check specific product origins to confirm authenticity and shipping logistics.
Do suppliers offer customization for these industrial control modules?
Customization is available for many automation products and machinery parts. Buyers can request specific modifications for their production lines. However, some standard models are listed as non-customized for immediate delivery.
How quickly do suppliers typically respond to inquiries?
Response times vary significantly among suppliers, ranging from under one hour to nearly six hours. Some vendors respond within 0.74 hours while others take longer. Fast response ensures quicker project initiation and support.



















